国产精品久久久夜夜高潮,人妻一区久久蜜桃,男人边吃奶边揉好爽免费视频,精品久久久噜噜噜久久久

TEL:+86-183-6006-7777
       +86-188-0063-3336

WELCOME TO JIANGSU HUAZHENG PIPELINE TECHNOLOGY CO., LTD!

ABOUT | PRODUCT | NEWS | CONTACT |

COMMITTED TO CREATING VARIOUS DRAINAGE PIPE MATERIAL

PROFESSIONAL SUPPLIER OF URBAN PIPELINE TRANSMISSION SYSTEM

NEWS
CONTACT US
Jiangsu Huazheng Pipeline Technology Co., Ltd
person: Manager Zhou

Mobile: +86-1836-006-7777

            +86-188-0063-3336

Tel: +86-0527-84550877
Web: zzuzl.cn
Add: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China


Analysis of Connection Method of Steel Strip Pipe
2019-1-8
source:unknown
clicks:  7622        作者:未知
  • There are several ways to connect steel strip and pipe:
    Hot melt extrusion welding, electric melt tape connection, heat shrinkable pipe (belt) connection and clamp connection can be used for the connection of_spiral ports. When connecting, the spiral ports of the pipe should be used to minimize the gap.
    _1. Hot-melt extrusion welding connection should be heated by special extrusion welding tools and extrusion welding rods to melt the adjacent pipe ends into a whole polyethylene material, which is a rigid connection method.
    _2. The connection of the electric melt Belt should be made by heating the polyethylene layer embedded in the inner surface of the electric melt belt to melt the polyethylene layer between the electric melt belt and the pipe trough into a whole, which is a rigid connection method.
    _3. The connection of heat-shrinkable tube (belt) should be heated by flame to make the hot melt adhesive on the inner surface of the shrinkable tube (belt) adhere to the outer surface of the tube; the heat-shrinkable tube (belt) forms a constant wrapping force after cooling and solidification, which belongs to the rigid connection method.
    _4. The clamp connection should be bolted to fasten two semi-circular outer sleeves, so that the adjacent pipe ends can be tightened, and the rubber plug between sleeves and pipe walls can meet the sealing requirements, which is a rigid connection method.
    Attention: The above connection methods can be combined to meet the design requirements. When rigid connection is adopted in pipeline, measures such as timely soil covering should be taken to reduce the longitudinal shrinkage of pipeline.
    Measures should be taken to prevent pipeline from floating during construction in rainy season. When the bubbles are found after the installation of the pipeline without covering the soil, the elevation of the center and bottom of the pipeline should be re-measured and inspected. If displacement, floating, drawing and other phenomena are found, they should be handled in time.

Address: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China  tel: +86-1836-006-7777/+86-188-0063-3336/+86-0527-84550877 Fax: +86-0527-84550877

All Rights Reserved: Jiangsu Huazheng Pipe Technology Co., Ltd. Su ICP Prepared: Su ICP Prepared 16060068 Technical Support: Suqian Webbo

主站蜘蛛池模板: 拜泉县| 梧州市| 平湖市| 洪洞县| 若羌县| 清河县| 息烽县| 出国| 黔西| 新兴县| 阳新县| 清河县| 靖西县| 灵璧县| 丰原市| 灌阳县| 鹤庆县| 孙吴县| 乐至县| 延吉市| 纳雍县| 浮山县| 宜兴市| 苍梧县| 青川县| 丰台区| 南乐县| 尉犁县| 嘉峪关市| 宜黄县| 华亭县| 姜堰市| 滨州市| 涞源县| 漳浦县| 河源市| 环江| 吉安市| 兴业县| 大英县| 信阳市|